Architecture, engineering & infrastructure projects across the region
| Client | Project | Scope of Work | Location | Cost (USD) | Year |
|---|---|---|---|---|---|
| WETICO Water & Environment / Arabian Yalin Contracting Co | Qiddiya STP WWTP-3 - PHASE-1 | Detailed Design and Shop drawings for the ROADS, Infra Structural Networks including 3D/BIM Models and Hydraulic Studies & Electrical Networks. | KSA | 30,000,000 | 2024 |
| ALYSHAR | Shoaiba Quaiza B Water Transmission System | Detailed Design and Shop Drawings for Road, Drainage including 3D/BIM Models, Structural, Electromechanical & Hydrology Study | KSA | 60,000,000 | 2024 |
| Mutlaq Al-Ghowari Co. | Yanbu Rayis Water Station | All MEP design works: HVAC Works | SCADA Systems | Fire fighting works | Cathodic Protection Systems | Electrical systems Internal station piping system | KSA | 350,000,000 | 2022-2023 |
| Neom - Gayal Water Station | All MEP design works: HVAC Works | SCADA Systems | Fire fighting works | Cathodic Protection Systems | Electrical systems Internal station piping system | 160,000,000 | 2023 | ||
| Neom - Al Badaa Water Stations | All MEP design works: HVAC Works | SCADA Systems | Fire fighting works | Cathodic Protection Systems | Electrical systems Internal station piping system | 370,000,000 | 2023 | ||
| Water Transmission System | All MEP design works: HVAC Works | SCADA Systems | Fire fighting works | Cathodic Protection Systems | Electrical systems Internal station piping system | 130,000,000 | 2022-2023 | ||
| North Jeddah Tanks / Khobar Admin Building 1&2 / Strip Mall | All MEP design works: HVAC Works | SCADA Systems | Fire fighting works | Cathodic Protection Systems | Electrical systems Internal station piping system | — | — | ||
| Water Transmission System Khobar - Hofouf | All MEP design works: HVAC Works | SCADA Systems | Fire fighting works | Cathodic Protection Systems | Electrical systems Internal station piping system | 55,000,000 | 2023 | ||
| Ghabbour | ITAMCO | MEP System Design Works including 3D/BIM Models | Greater Cairo, Egypt | 12,000,000 | 2015 |
| Prima Industries | As-Built & Fire System Design Works & Ventilation including 3D/BIM Models | — | 2017 | ||
| KM3 | Fire Foam System Design & Supervision of Works | — | 2017 | ||
| Sigma Supply | Fire System Design & Supervision of Works | — | 2018 | ||
| MarcoPolo | Fire Report | — | 2019 | ||
| Abo-Rawash Admin Building | All MEP Design Works including 3D/BIM Models | — | 2019 | ||
| Ghabbour Farms | Fire System Design Works | — | 2020 | ||
| Dry Port | Fire System Design Works | — | 2022 |
| Client | Project | Scope of Work | Location | Cost (USD) | Year |
|---|---|---|---|---|---|
| Al - Yamama Co. | Al - Dammam Project 3 | All structural and electrical shop drawings including 3D/BIM Models | KSA | 200,000,000 | 2023/2024 |
| Mutlaq Al-Ghowari Co. | Neom - Gayal Water Stations | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | KSA | 196,500,000 | 2022 |
| GREEN RIYADH WTS stations | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 200,000,000 | 2022 | ||
| AR RJUM GOLD PROJECT | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 150,000,000 | 2022 | ||
| RIYADH City Southern Ring WTS stations | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 625,000,000 | 2023 | ||
| RAS - ELKHAIR WTS stations | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 437,500,000 | 2023 | ||
| AL-HAER Independent sewage treatment plant | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 58,500,000 | 2023 | ||
| Alshuqiq Jizan WTS - Phase 4 (EPC) | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 1,125,000,000 | 2023 | ||
| Desalination water unit of SHOAIBA production system phase 2 | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 412,500,000 | 2023 | ||
| Desalination water unit of YANBU production system phase 2 | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 607,500,000 | 2023 | ||
| Airport Sewage lifting station | Structure, Architecture, Earthwork, Infrastructure (wet utilities), MEP And Instrumentation tendering & Design works | 161,250,000 | 2023 | ||
| Cast In-SITU Culverts In Zone AE | Structure, Architecture, Earthwork, Infrastructure tendering & Design works | 250,000,000 | 2023 |
| Client | Project | Scope of Work | Location | Cost (USD) | Year |
|---|---|---|---|---|---|
| Direction Interior Design Office | Arkadia Mall | MEP Design & Works Supervision | Greater Cairo, Egypt | 6,000,000 | 2020 |
| City Edge Admin Office | MEP Design & Works Supervision | — | 2020 | ||
| Swan lake Private Villa | MEP Design & Works Supervision | — | 2020 | ||
| Belton Nile City | MEP Design & Works Supervision | — | 2021 | ||
| Otrac's Admin office | MEP Design & Works Supervision | — | 2021 | ||
| Energizer's Admin Office | All MEP Design Works & Supervision | — | 2020 | ||
| TMG | Four Seasons - Conference Center | Preparing MEP & Arch. Tender Documents | Sharm El-Sheikh, Egypt | 45,000,000 | 2020 |
| Open Air Mall | Drainage & Water Supply Works | Madinaty, Cairo | 6,000,000 | 2018 | |
| Iwan Developments | Iwan Admin Office | Fire & HVAC Design Works | Giza, Egypt | — | 2021 |
| Yasseen Mansour | Private Villa | All MEP Design Works & Supervision | Giza, Egypt | — | 2022 |
| Intertex | Admin Office | Fire & HVAC Works | Cairo, Egypt | — | 2017 |
| Cairo Cotton Center | CCC Factory | All Electrical Works Designs | Cairo, Egypt | — | 2013 |
| Ismailia Authority | Free Industrial Zone | All Electrical Works Designs | Ismailia, Egypt | — | 2013 |
| REDA Chemicals | REDA Factory | Design & Build of all Electrical Works | Cairo, Egypt | — | 2012 |
| Nissan Egypt | Nissan Factory | Design Works of Entrances | Cairo, Egypt | — | 2010 |
| Coca-Cola | Admin Building | All MEP Design Works & Supervision | Cairo, Egypt | 2,000,000 | 2007 |
| CocaCola Factory | All MEP Design Works & Supervision | — | — | ||
| Misrata Authority | Almarj Residential Compound | All Electrical Designs | Libya | 20,000,000 | 2006-2008 |
| Abyar - Residential Compound | All Electrical Designs | 18,000,000 | — | ||
| Al-Rajhi Construction | Buraida Compound | All Electrical Works Designs | KSA | — | 2005 |